Speed matters when the foundation is on the critical path.
Production advantage: Fuller Pile® installation can reach 8–16 piles per day per rig and Fuller Pile® Rigid Inclusions can reach up to 50 inclusions per day per rig, depending on soil conditions and pile type.
The Foundation Schedule Sets the Tone
When foundations slow down, everything behind them feels it: concrete, steel, framing, MEP rough-in, and turnover. Fuller Pile® is built for projects where schedule matters, especially sites that need deep foundation performance without the disruption of traditional driven piles or spoil-heavy drilled systems.
Small Equipment, Big Production
Fuller Pile® installation uses compact, CAT-class equipment with auger attachments. That smaller footprint can improve access, reduce jobsite congestion, and allow multiple rigs to work at once when the schedule demands it. For general contractors, that means a foundation plan that can scale instead of becoming a bottleneck.
Less Time Lost to Spoils and Site Disruption
Because Fuller Pile® is installed using controlled displacement, the process can avoid the spoil generation common with many drilled systems. Less spoil means fewer trucks, less disposal coordination, and less risk of delays tied to contaminated or difficult-to-handle soils. It also helps keep active jobsites cleaner and easier to coordinate.
Real Project Momentum
Claycor’s project history shows how speed can translate into real schedule value. Examples include 210 FP450 Fuller Piles installed in one week at the ROPER Sawmill project, 10 FP450 Fuller Piles completed in two days including mobilization for the Ravenel Bridge stair tower work, and large rigid inclusion packages installed across major commercial and public projects.
Fast Does Not Mean Loose
Speed only matters if quality stays controlled. Fuller Pile® projects can include delegated design, installation monitoring, grout volume records, load testing, and as-built documentation as required by the project. That combination is what makes the system attractive: fast installation with engineering discipline behind it.
Need to protect the critical path? Ask Claycor how Fuller Pile® can support a faster foundation package.